Housing at scale

You define the housing requirement.We provide the construction system.

Government, housing agencies and developers delivering a programme, not a single home.

The systems

Matched to the programme.

Housing programmes are not all delivered the same way.
We assess scale, repetition, site access and timeframe, then recommend the right mix of on-site printing and factory production, including both across one programme where that is the right answer.

The OPUS gantry printing a duplex in place on its slab at Genesis

On-site housing delivery

Print directly on the slab.

For housing projects where printing in place is the right fit, OPUS prints structural walls directly on site.
It is the model behind the housing we have delivered to date.

  • Walls print to final form, with no bespoke formwork for the printed geometry
  • Varied dwelling types without new tooling for each one
  • Printed on your site by our own crew
  • Suits lower repetition and one-off dwelling forms

Delivered on Genesis, Dubbo social housing and Geelong Homes.

The OPUS gantry printing columns on the factory floor

Factory-led housing delivery

Manufacture off site, assemble on site.

For repeatable programmes and constrained sites, homes or components are produced in the factory and delivered for assembly.
Off-site production is what gives a programme control over conditions.

  • Controlled factory production, with reduced weather exposure
  • Repeatable components across a whole programme
  • Factory production runs alongside site works
  • Suits constrained or remote sites

Delivered on the Jamie Durie house and the Genesis Duplex.

Selection

How we pick the system.

Programme size

A handful of dwellings favours printing in place.
Larger, repeatable programmes may suit factory production.

Site access

Constrained, remote or live sites can favour units delivered ready to install.

Timeframe

Factory production can run concurrently with site works, compressing the overall programme.

Design repetition

Highly repeatable dwelling types suit factory production.
Varied or bespoke forms suit printing in place.

Approvals

Built.
Approved.
Occupied.

Every programme runs through structural design and the relevant certification pathway before a wall is printed.
Dubbo Regional Council approved the Dubbo development application in July 2024, and the Gymea home was the first 3D printed home in Australia to earn a full occupation certificate.

Inside a completed Contour3D printed home during the NSW Government visit, with the printed layer lines visible behind

Next step

Tell us about your programme.

Dwelling count, location and timeframe are enough to start.
We will come back with which system fits and what delivery would involve.