Factory printed products
Printed concrete products, made to order.
Printed off site in our NSW factory and delivered ready to place. Curved or complex, repeatable or one-off.
Why factory printing works.
Repeatable production
Print the same component to the same tolerance, again and again, in a controlled factory.
No formwork
Additive printing removes the cost, waste and lead time of traditional moulds and formwork.
Custom geometry
Curves, voids and double-curved forms print at no extra cost. Design is no longer limited by the mould.
Faster iteration
Move from concept to a printed prototype in days, then refine before committing to a production run.
Less labour, safer
A small specialised crew replaces large labour gangs, with no formwork at height.
Concurrent build
Components are manufactured off-site while site works continue, compressing the program.
Scalable
Develop a product once, then scale to volume as demand grows.
Lower cost
No moulds to make or store, a smaller crew and less waste. The cost sits in the file, not in tooling.
The range
A range built to print.
Nine families for landscape, public space and outdoor rooms, designed around what the printer does well. Sizes and finishes are still being set, and every piece is quoted for its site.
These are design references, not photographs of stock.
Retaining walls
Curved retaining and planter walls, printed to the line of the site.
Planters
Ribbed planters for landscape, retail and commercial projects.
Seating & loungers
Formed seating and loungers with no joins.
Picnic tables
Table and bench sets for parks and public space.
Table bases
Printed bases, finished with the top of your choice.
Outdoor counters
Kitchen and bar counters for outdoor rooms.
Outdoor showers
Curved shower enclosures for pools, beaches and gardens.
Feature walls
Textured screen and feature walls, patterned in the file.
Fire rings
Fire rings and firewood stores, printed in one piece.
The factory route
Printed, delivered, assembled.
01 · Manufacture
Components printed to the same file, in controlled conditions.
02 · Deliver
Loaded and trucked to site, ready to crane.
03 · Assemble
Craned into place and carrying load on site.
32 structural columns, Jamie Durie's Future House.
Next step
Send us the piece you need.
A drawing, a photo or a rough sketch is enough. We come back with a price, a lead time and any engineering limits worth knowing.