Housing

The Block, Tree Change

3D printed elements for the Tree Change house on The Block 2022, our first build outside the factory.

Type

House, printed elements

Location

Macedon Ranges, VIC

Client

The Block, Nine

Delivery model

On-site OPUS printing

Print time

2 days

Material

10 t ContourCrete

Result

Early proof of printing outside the factory in difficult weather conditions

Recognition

The Block 2022, Nine

The challenge

Prove printing could work outside the factory, live on a television build site, in the Macedon Ranges through Victorian winter weather.

The solution

We printed columns along the Tree Change house's front elevation on site, with the layer lines left as the finish rather than rendered over.

Printing & technology

The columns took around 2 days of print time and 10 tonnes of ContourCrete, printed live through Victorian rain and snow.

Delivery & results

Our first build outside the factory, and early proof that on-site printing could hold up in difficult weather. Two further printed pieces went in on the same site: a pool cabana and a garden bed.